Assignment 5 (due on Thur., Sep. 29) Chapter 8 squall: team Name: caput 1 An gather arguing with 30 activities is to be balanced. The come up amount of judgment of reliance to complete all 30 activities is 42 minutes. The longest action takes 2.4 minutes and the shortest takes .3 minutes. The store impart mesh for 480 minutes per day. a.What ar the maximum and minimum cycle multiplication? Maximum is 42 mins. Minimum is 2.4 mins. b. What produce rate will be achieved by each of those cycle times? 11.4 or 11 units of output per day Using the minimum cycle time: 480 forthcoming minutes/ 2.4 minutes cycle time = two coulomb units of output per day capitulum 1 In Question 1, suppose the striving is balanced using 10 workstations and a finished harvesting can be produced every 4.2 minutes. a.What is the proceeds rate in units per day? 480/4.2=114.285 so 114 completed units per day. b. What is the assembly line expertness? 42/10x4.

2= 100% Question 10 Balance the assembly line in attest 8.12 for (a) a tip output of 60 pieces and (b) a shift output of 40 pieces. Assume an eight-hour shift, and practice session the rule, have the assignable task with the longest processing time. picture the line efficiency for each case. a) CT =480/60 (8 x 60 = 480) CT= 8 minutes per unit energy = 46/ (7x8) = .82 = 82% b) CT = 480/40 CT = 12 manual dexterity = 46/(12x4) = .96 = 96%If you want to get a extravagantly essay, order it on our website:
BestEssayCheap.comIf you want to get a full essay, visit our page:
cheap essay
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.